How to import a PCO and change order log CSV

Prepare a CSV for the contractor register with stable change identifiers, PCO or COR type, revision status, USD costs and schedule days.

Workflow

  1. Use the headers shown in the paste dialog or fill it with the example.
  2. Keep amounts in USD dollars and OH&P in integer basis points. Quote fields that contain commas.
  3. Import up to 150 rows and confirm the project name, original contract sum and caps already in the workbench.

Worked example

Enter 10% markup as 1000, a $20.25 fee as 20.25, and revision 2 as 2 or Rev 2.

Open the change order workbench

Questions and answers

What happens if a paste exceeds the limit?

The importer reports the 128 KiB maximum and leaves the existing register in place.